Güvercinlik Ready Mixed Concrete Facility

About

At this facility which is the main base for the other facilities running their operations within Ankara, we have two ready mixed concrete plants. Our ready mixed concrete facility established within Ankara Cement Plant enjoys the advantage of its location proximal to all regions within Ankara. Owing to its vast stock yard and recycling units, it is one of our plants that are fully compliant with the Environment legislation.
 
We have a structure which accepts the idea that our employees may not be productive without events that are periodically organized to help them adapt themselves to the busy work pace and making them feel part of the teamwork. 

Below are the projects we have completed with solution suggestions for our business partners;


MERKEZ ANKARA 

Turkey's largest real estate project with mixed use by Pasifik Construction, built on a single building plot. We're casting high class concrete by means of stationary pumps and distributors.  


TOGO TOWERS

At this project comprised of offices and commercial areas shaped around a country, we met the need of high class concrete by means of stationary pumps and distributors in a narrow casting area. Thanks to the special equipment that will enable our Güvercinlik facility to cast concrete during winter months, too, we provided this project with the concrete produced using our winter recipes with no problem.


ANKARA SUPREME COURT OF APPEALS COMPLEX 

For the concrete requirement of the complex built by Rönesans Construction, we established a plant within the project and provided our solution partner with concrete with no interruptions. We were able to cast the concrete for 24/7 even under challenging winter conditions.



ANKARA-KONYA HIGHWAY GÖLBAŞI UNDERPASS PROJECT 

The project plant we established for SNH Makimsan enabled us to cast water-impermeable concrete, making use of special recipes, for Gölbaşı underpass.

 

 
 
KOÇ TOWERS

In order to meet needs of our business partner at this project consisting of 172 offices and 64 shops, we were able to cast concrete, even during winter months, with our concrete recipes designed for stationary pumps used for casting concrete on high-rise floors.

 

 
 
 
NEORAMA

For this single 24-story block consisting of 92 independent units, we met the need of high class concrete by means of stationary pumps and distributors in a narrow casting area.

 
 

KUZU EFFECT

The block of this project built in Çankaya Oran, the most valuable location of Ankara, is one of the highest buildings of Ankara. We provided our solution partner that cast C45 concrete class on the said high-rise block with stable and uninterrupted concrete produced at our plants.

 

NEXT LEVEL

This is Ankara’s first ever project with mixed use that employs functions such as office, residence and mall. We cast concrete for the foundation excavated way too lower than the road level with the Mobile + Stationary + Stationary method.


 
ANKARA SCIENCE HIGH SCHOOL JUNCTION

We cast C50 concrete for the overpass project built over an underpass by means of specially designed French moulds, following special casting techniques. We completed the concrete casting, within 60 days, for our solution partner that created a design that does not allow the weight to be carried by the bridge alone.   

         

BİLKENT BMZ NAZENDE RESIDENCES

we rendered a rapid and reliable service for concrete casting by our solution partner which cast concrete with wide floor spans at the complex comprised of 314 residences.